Red Hat build of OpenJDK end-of-life dates

Red Hat build of OpenJDK 25 reaches end of life on 2030-12-31.

CycleReleasedActive support endsEnd of lifeLatestLTS
252025-11-132030-12-3125
212023-11-142029-12-3121.0.9.0.10-1
172021-11-112027-12-3117.0.17.0.10-1
112018-10-012024-10-3111.0.25.0.9-3
82014-10-012026-11-301.8.0.472.b08-1
72007-03-152020-06-301.7.0.261-2.6.22.2
62007-03-152016-12-311.6.0.41-1.13.13.1

Facts

Source
endoflife.date (checked 2026-09-09)

Release cycles

Red Hat build of OpenJDK has 7 tracked release cycles.

3 cycles have reached end of life.

Keelbench tracks end-of-life dates for 469 products, updated daily. Check your repositories against these dates with Deps.